Laserfiche WebLink
ROAnARLE FOUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $54.65 1 $54.65 $54.65 <br />-Light Duty Pickup, 4x4, 314 T. $30.11 1 $30.11 $30.11 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $84.76 $84.76 <br />_ ................... <br />..... <br />EQUIPMENT HAUL DISTANCE and TIME <br />Transportation Cycle Time : <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br /> Nearest major city or town within project area region : Norwood <br />Non- Total one-way travel distance : 5.0 miles <br />Roadable Roadable Average travel speed : 25.0 mph <br />Equipment Equipment <br />0.20 0.20 Total non-roadable mob/demob cost' : $3,323.17 <br />0.20 0.20 • two round trips with haul rig <br />0.50 NA Total roadable mob/demob cost $33.91 <br />0.50 NA one round trip, no haul rig <br />1.40 0.40 <br /> <br />..:.....:... .. . <br />Total job time : <br />2.80 hours <br /> Total job cost : $3,357