Laserfiche WebLink
CIRCES Cost Estimating Software <br />M <br />PROJECT IDENTIFICATION <br />Agency or organization name :DRMS <br />Task #: 08a State :Colorado <br />sheet 1 of 2 <br />Date : 0811312010 County :Montrose <br />User : GRM Site :Norwood Pit <br />Permit or other job action :Final Reclamation Liability Estimate - 2010 Update <br />Task description :initial mobilization to site <br />.......... <br />EQUIPMENT TRANSPORT RIG COST Shift basis : ................ <br />1 per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities :1 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D9R - 9U (2005) 67.38 $58.16 $125.45 3 $550.83 $376.35 $0.00 <br />-Cat 651E 67.38 $84.38 $125.45 2 $419.66 $250.90 $0.00 <br />-Water Tanker, 7,000 Gal. 29.65 $39.04 $117.55 1 $156.59 $117.55 $0.00 <br />-reveg equipment 10.00 $30.00 $88.67 1 $118.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $1,245.74 $833.47 $0.00 <br />Permit/job #:M-1988-037 <br />Abbreviation :none <br />Filename :M037-08a