Laserfiche WebLink
In summary, the operator does agree with the Division of Reclamation, Mining and Safety that <br />the permit should be a non-phased operation. <br />If you need additional information, please call me at 719-240-9424 or e-mail at <br />jRiz@incasys.com. Thanks for you concern in this matter. <br />incerel <br />N <br />. I t?4 oe Gagliano <br />Consultant <br />Cc: SUMMIT BRICK & TILE <br />File <br />Enclosure: DRAWING SHEETS 1 OF 6 TO 6 OF 6 <br />2 PHOTOGRAPHS OF THE EARTHEN BERM FOR FUEL SPILL CONTAINMENT <br />CERTIFIED MAIL: 7007 2680 0002 7552 3309