Laserfiche WebLink
The demolition costs for the above-mentioned improvements to bring back the permitted area <br />to range land status is as follows: <br />Demolition Quantities <br />Demolition Material Quantities <br />Building materials (2-story addition) 90 CY <br />Concrete floor & footer 38 CY <br />Concrete fire proof vault 9.5 CY <br />Exterior side walks & retaining wall 27.0 CY <br />Total Demolition Material 164.5 CY <br />Demolition Costs <br />Note: All equipment costs include equipment rate, operator, burden and fuel. <br />Equipment/Description Unit Unit Cost Total Cost <br />CAT 320 Excavator w/Breaker 8 HOURS $111.99 $895.92 <br />CAT 320 Excavator w/Thumb 16 HOURS $71.67 $1,146.72 <br />CAT 950 Wheel Loader 4 HOURS $64.26 $257.04 <br />Tractor/Trailer 11 Loads @ 1.5 Hrs p/load 16.5 HOURS $84.48 $1,393.92 <br />Scale House (Disassemble and Haul) 1 LUMP SUM $1,000.00 $1,000.00 <br />Note: 50% of new unit already accounted for in financial warranty under original unit. <br />Local Landfill Dump Fee/Refuge Charge 164.5 CY $9.00 $1,480.50 <br />Total Demolition Costs <br />Overhead and Profit @ 18% <br />Total Costs <br />Existing Financial Warranty Bond <br />Proposed Technical Revision Amount <br />Proposed total <br />$6,174.10 <br />1,111.34 <br />$7,285.44 <br />$532,385.00 <br />$7,285.00 <br />$539,670.00 <br />Sincerely, <br />Randy DiLuzio <br />General Manager <br />Enc. <br />RD/as