Laserfiche WebLink
-Restoration Task Proposed Activity Justification Division Response <br />-Chief Restore drainage configuration Minimize disturbance to the Not Approved--Nei legal access <br />Portal/Deadwood as outlined in restoration plan existing hydrologic balance and currently exists to transport equipment <br />Gulch previously submitted in to prevent off site erosion and to the site. The unpermited access road <br /> response to Reason to Believe sedimentation impacts cannot be used to transport equipment <br /> Letter to the site. In addition, this requested <br /> work would be conducted outside the <br /> permit area. Wheat must secure a <br /> permit for this area prior to <br /> commencement of activities. <br />-May Day Portal No. Stabilize bench, grade and seed Minimize disturbance to the Not Approved at this time--No legal <br />2/Deadwood Gulch install culvert as outlined in existing hydrologic balance and access currently exists to transport <br /> restoration plan submitted in to prevent off site erosion and equipment to the site. The unpermited <br /> response to Reason to Believe sedimentation impacts access road cannot be used to <br /> Letter transport equipment to the site. If <br /> Wildcat is able to secure site access <br /> from USI+S, Wildcat may submit a <br /> Technical Revision to the Division, <br /> including detailed specifications, for <br /> review and approval. At this time, <br /> hand removal of trash/debris from <br /> Deadwood Creek is allowed. <br />-Grade New access Grade road surface pursuant to Minimize disturbance to the Not Approved at this time---This <br />road Road Construction Work Plan existing hydrologic balance and requested work will be performed in <br /> previously submitted as part of to prevent off site erosion and an area outside the approved permit <br /> Idaho Mine Adequacy sedimentation impacts that may boundary and plans have not been <br /> Response, to allow drainage to occur to the down gradient approved to allow this type of activity. <br /> be collected on the inside cut, wetlands, improve road The Division engineering staff <br /> install silt fences, clear culver drainage, remove large rocks inspection and analysis have <br /> inlet of brush and debris, install from road surface, where determined that the unpermitted road <br /> trash rack, install debris basin possible stabilize and correct cannot be used by any size motorized <br /> at culvert outlet, prepared cribbing vehicle in its current condition. At this <br /> affected area for seeding, time, the Division will only approve <br /> remove material from the work that can be completed by hand <br /> driveway entrance per County without the use of motorized vehicles <br /> request, conduct geotechnical on the unpermitted road. Any hand <br /> investigation of cut and fill, test work that Wildcat will conduct on the <br /> cable integrity and stability road must be submitted to the Division <br /> as a detailed plan for review and <br /> approval. (For examples of authorized <br /> hand work, refer to the interim BMP <br /> measures previously discussed with <br /> Wildcat by e-mail dated May 18, 2010.) <br />Restoration Page 1 of 3