Laserfiche WebLink
CIRCES Cost Estimating Software <br />MFNT MOBILIZATION / DEMOBIL12 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DBMS <br />Task #: 007 State : Colorado <br />sheet 1 of 2 <br />Date : 0810212010 County :La Plata <br />User : RCO Site :Montoya Pit <br />Truck trailer description <br />Generic folding goosenecl <br />Available rig capacities <br />Ownership cost/hour <br />Operating cost/hour <br />Operator cost/hour <br />Helper cost/hour <br />Total Unit Cost/hour <br />Cost Breakdown : <br />N0N.RnADAgLF FDUIPMFNT <br />drop deck equipment trailer (25T, 50T, and 100T) <br />0-25 Tons 26-50 Tons 51+ Tons <br />$16.63 $18.37 $22.33 <br />$44.38 $46.13 $50.07 <br />$27.66 $27.66 $27.66 <br />$0.00 $25.39 $25.39 <br />$88.67 $117.55 $125.45 <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D10R - 10SU (2005) 92.16 $76.61 $125.45 1 $202.06 $125.45 $0.00 <br />-Reveg equipmt 6.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br />-Weed spray eqpt 5.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $399.40 $302.79 $0.00 <br />Permit/job #:M-1980-146 <br />Abbreviation :none <br />Filename : M146-007