Laserfiche WebLink
_. . <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Transportation Cycle Time : Non- <br /> Roadable <br /> Equipment <br />Haul time (hours) = 0.25 <br />Return time (hours) = 0.25 , <br />Loading time (hours) = 0.50 <br />Unloading time (hours) = 0.50 <br />Subtotals = 1.50 <br />Nearest major city or town within project area region <br />Total one-way travel distance <br />Roadable Average travel speed <br />Equipment <br />0.25 Total non-roadable mob/demob cost' <br />0.25 ' two round trips with haul rig <br />NA Total roadable mob/demob cost "" <br />NA " one round trip, no haul rig <br />0.50 <br />Durango <br />10.0 miles <br />40.0 mph <br />$1,149.89 <br />$0.00 <br />JOB TIME AND COST Total job time : 3.00 hours <br />Total job cost : $1,150 <br />EQUIPMENT HAUL DISTANCE and TIME