My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-02_REVISION - M1980146
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980146
>
2010-08-02_REVISION - M1980146
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:17 PM
Creation date
8/5/2010 2:14:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980146
IBM Index Class Name
REVISION
Doc Date
8/2/2010
Doc Name
Cost Summary Form
From
DRMS
To
C&J Gravel Products, Inc.
Type & Sequence
AM4
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $89.77 NA <br /> Operating cost/hour : $128.30 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $256.60 Total fleet cost/hour : $256.60 <br />..:...... <br />MATERIAL QUANTITIES _ ....: :::. ...: _..:. <br />Initial Swell Loose <br />volume : 87,120 C CY factor : 1.165 volume : 101,495 LCY <br /> <br />Source of estimated volume :amendment <br />Source of estimated swell factor :program <br /> <br /> <br />HOURLY PRODUCTION ........ <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,718.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.22 (Cat HB) <br />Average push gradient : 10.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.44 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 748.49 LCY/hr <br /> Adjusted fleet production : 748.49 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 135.60 Hours <br />Unit cost : $0.343 /LCY Total job cost : $34,795 <br />
The URL can be used to link to this page
Your browser does not support the video tag.