Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.. .. .... ..... ............. . <br />PROJECT IDENTIFICATION <br />Task #: 004 State : Colorado Permit/job# : M-1980-146 <br />Date <br />User <br />07/30/2010 <br />RCO <br />County: La Plata <br />Site : Montoya Pit <br />Abbreviation :none <br />Filename :M146-004 <br />Horsepower : 570 <br />Agency or organization name : DRMS <br />Permit or other job action :Amendment 4 <br />Task description :Replace subsoil and topsoil <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D10R - 10SU (2005) <br />. Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Shift basis : 1 per day <br />Data source : (CRG) <br />volume : 87,120 BCY factor : 1.330 volume : 115,870 LCY <br /> <br />Source of estimated volume :72 ac x 9 in a vg depth <br />Source of estimated swell factor : program <br /> <br />.:.. ;> <br />HOURLY PRODUCTION <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.10 (Cat HB) <br />Unadjusted hourly production : 1,718.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift1day) <br />Partly consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.17 (Cat HB) <br />Average push gradient : 7.50 % (neg) Altitude : .1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.58 <br />Weight description <br />Earth - Dry packed Adjusted unit production : 994.36 LCY/hr <br /> Adjusted fleet production : 994.36 LCY/hr <br /> <br /> <br />JOB TIME AND COST ..:..... :.. <br />Fleet size : 1 Dozer(s) Total job time : 116.53 Hours <br />Unit cost : $0.258 /LCY Total job cost : $29,901 <br />