Laserfiche WebLink
4 (Form 2- Public) <br />5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Three drill pads on slopes to be leveled by cut/fill using track-loader to establish safe working area. Excess material, if <br />any, to be use as perimeter berms/run-on controls. Each pa to be approximately x equipped With sump mu pi <br />nominally 6' x R x 2' deep for drill water circulation Existing two-track roads will b used foraccess - on minor extension <br />approximately 150-ft. long will be required to access the Pad 1 location; however, this segment will be on the Freiburg <br />patented clain, and distuibarice limited to rninoi dediing and dozing to accommodate vehicle and drill access-to-the-pad-.- <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 3 Average Width 20' <br />B. <br />Drill Holes: Quantity conr0e""a' Depth Confidential <br />(ft) Average Length 20' (ft) <br />(ft) Diameter BTW - 2.35" OD (in) <br />(ft) Average Length 6 (ft) <br />C. Mud Pits: Quantity 3 Average Width 6 <br />Average Depth 2 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />No underground work proposed at this time. AGC reserves the right to <br />modify/supplement this NOI at a later date if/when underground work is proposed. <br />D. Other Disturbances (please describe): <br />E. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />55-gal diesel fuel in onboard tank of Hagby drill; 5-gal plastic pails polymer mud (4 ea.); 1-gal plastic <br />containers motor oil (2 ea.); grease gun cartridges (4 ea.); small aerosol cans penetrating oil (3 ea.); small <br />aeFesoi oans staFting fluid (3 ea.)--, 5 gal pail Fed grease (I ea.); 94 1b. sacks Portland eement (2 ea.); 50 . <br />sack soda ash (1 ea.). All materials to be stored or transported on light vehicles (pick-up trucks) or <br />otherwise stored/located on covered wood pallet(s) within the defined perimeter of the drill pad feature. <br />F. New Road(s): Length 150 (ft) Width 12 (ft) <br />Significantly Upgraded Road(s) Length N/A (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />None proposed The 150-ft. "new" road will be a short connector/extension segment <br />from existing roadway to Pad 1 with entire length on the Freiburg patented claim.