My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-03_REVISION - M2000158
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2000158
>
2010-08-03_REVISION - M2000158
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:17 PM
Creation date
8/4/2010 8:43:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000158
IBM Index Class Name
REVISION
Doc Date
8/3/2010
Doc Name
Adequacy Review #3
From
DRMS
To
Civil Resources, LLC
Type & Sequence
AM2
Email Name
JLE
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HOURLY PRODUCTION sheet 2 of 2 <br />Hauling Capacity : <br />Scraper Payload (weight) Basis : Scraper Bowl (volume) Basis : <br />Material weight : 1,600 pounds/LCY Struck volume : 24.00 LCY <br />Material description : Heaped volume : 34.00 LCY <br />Top Soil Average volume : 29.00 LCY <br />Rated payload : 75,000 pounds Adjusted capacity : 29.00 LCY *** <br />Payload capacity : 46.88 LCY ••' hourly production reflects volume per scraper pair on push-pull models <br /> <br />Cycle Time : Job Condition Corrections : Site altitude (ft.) : 4,770 <br /> Scraper Push dozer Source <br />Scraper loading time 1.00 minutes Altitude adj.: 1.000 NA (Cat HB) <br />Maneuver and spread time : 0.60 minutes Job efficiency : 0.830 NA (Cat HB) <br />* load time per scraper pair on push-pull models Net correction : 0.830 NA <br />Travel time : <br />Road condition description :Firm, smooth, rolling, dirtft surfaced, watered, maintained <br />Haul Route : <br />Seg. # Haul distance (feet) Grade (%) Roll. res. (%) Total res. (%) Velocity (fpm) Travel time (min.)** <br />1 1,400 0.00 3.00 3.00 2800 0.73 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Return route : <br />Haul time : 0.73 minutes <br />** travel time for each segment is adjusted for acceleration/deceleration. Return time : 0.63 minutes <br />table velocities are max. attainable per total resistance shown, not average <br />Total scraper team cycle time (load + haul + maneuver and spread + return) : 2.96 minutes <br />Unadjusted unit production/hour : 1,175.08 LCY/hour *** Adjusted for job conditions : 975.32 LCY/hour <br />Optimal number of scrapers per push dozer : NA Selected number of scrapers : 4 scraper(s) <br />Adjusted single scraper team (unit) hourly production : 1,950.63 LCY/hour <br />Adjusted multiple scraper team (fleet) hourly production : 1,950.63 LCY/hour <br />5XXXXXXXXX <br />JOB TIME:.; ::.:..................................._..........................................:..,.._ ........................._......................... _............... <br />AND COST <br />....._..._....._........... <br />........................... <br />Fleet size : 1 Team(s) Total job time : 204.99 Hours <br />Unit cost : $0.746 /LCY Total job cost : $298,240
The URL can be used to link to this page
Your browser does not support the video tag.