Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Permit or other job action : Warranty Estimate ForAm02 <br />Task description : Spreading topsoil over the affected land <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 perday <br />Equipment Description <br />Cost Bre <br />Scraper work team -Scraper : Cat 637G w/push-pull <br />-Push dozer:NA <br />Support equipment -Load area :NA <br />-Dump area : NA <br />Road maintenance -Motor grader : CAT 120H <br />-Water truck : Water Tanker, 10,000 Gal. <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA NA NA grader misctruk <br />% Utilization-machine : 100 NA NA NA 20 1 <br />-Ripper attachment : NA NA NA NA 0 NA <br />Ownerhip cost/hour : $109.89 NA NA NA $18.36 $62.58 <br />Operating cost/hour : $173.96 NA NA NA $5.13 $0.93 <br />Ripper op. cost/hour : NA NA NA NA $0.00 $0.00 <br />Operator cost/hour : $38.72 NA NA NA $38.91 $38.70 <br />Unit subtotals : $322.57 NA NA NA $62.40 $102.21 <br />Number of units : 4 0 0 0 1 1 <br />Group subtotals : Work : $1,290.28 Support : $0.00 Maintenance : $164.61 <br />Total work team cost/hour : $1,454.89 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 399,865 LCY factor : NA volume : 399,865 LCY <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />02A State : Colorado Permit/job # : M-2000-158 <br />0713012010 County :Weld Abbreviation :none <br />JLE Site: S & H Mine Filename :M158-02A <br />Source of quantity take-off : Estimate from Exhibit Map and Reclamation Plan <br />Source of estimated swell factor :NA