My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_PERMIT FILE - M2009076 (23)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2009076
>
2010-07-27_PERMIT FILE - M2009076 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:50 PM
Creation date
7/29/2010 2:59:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009076
IBM Index Class Name
PERMIT FILE
Doc Date
7/27/2010
Doc Name
Adequacy Response- Ex. T- EPP
From
Venture Resources
To
DRMS
Email Name
ACS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Please refer to the explicit operating parameters in Exhibit C, 6.3.3(1)(k) for more information. Additionally, <br />Exhibit D, 6.3.4(1)(e) specifies decommissioning and reclamation measures for the Mobile Mill Site. The Tailings <br />Impoundment consists of a composite liner that contains processed tailings that are relatively non-acid forming. <br />Refer to the waste stream characterization contained in the appendix of Exhibit C. <br />There is no acid mine drainage from any adits, tunnels, or underground mine workings on this site either pre- <br />existing or proposed. <br />6.4.20(6)(b)(i) <br />There are no Designated Chemicals to be used in this operation. Refer to Exhibit C, 6.3.3(2)(a) for a list of non- <br />designated chemicals to be used. There is also a complete collection of MSDS for these chemicals at the end of <br />Exhibit C. <br />There are no hydrometallurgical extractive processes proposed as part of this operation, only gravity and flotation <br />concentration methods. <br />6.4.20(6)(b)(H) <br />To avoid redundancy, the handling methods of potentially acid forming waste rock have been described at length in <br />Exhibit C and above in 6.4.20(6)(a). <br />Additionally, Exhibit D, 6.3.4(1)(e) specifies decommissioning and reclamation measures for the Mobile Mill Site. <br />The Tailings Impoundment contains processed tailings that are essentially non-acid forming. Refer to the waste <br />stream characterization contained in the appendix of Exhibit C. <br />6.4.20(6)(b)(iii) <br />Venture Resources will adhere to the operations plan set forth in Exhibit C. This plan has been devised to prevent <br />adverse off-site impacts through measures of stormwater control, operator training, carefully monitored processing, <br />routine inspection of equipment, etc. <br />The reclamation measures set forth in Exhibit D. 6.3.4(1)(e) for the Mobile Mill Site shall also apply for periods of <br />Temporary Cessation. Because of the phased reclamation prescribed for the Tailings Impoundment, stability of that <br />stricture will be maintained during a period of Temporary Cessation. <br />6.4.20(6)(c) <br />There is approximately 8,000 tons of pre-existing abandoned mine waste rock currently contained within the <br />proposed Tailings Impoundment area. This material is going to be processed to remove acid forming materials <br />(sulfide minerals and heavy metals). A detailed explanation of this process is found in Exhibit C. <br />This treatment provides a net benefit of 2-3 order of magnitude, in many cases, when compared to its pre-existing <br />state. Refer to the waste stream characterization before and after analysis in the appendix of Exhibit C. The <br />resulting tailings are essentially non-acid forming. <br />The temporary Crislier Feed Pile is sheltered with sides/roof and has a concrete liner and containment berm to <br />prevent any acid runoff/seepage during operations. See 6.4.20(6)(a) of this Exhibit T for more on handling. <br />The fate of acid forming material at this site is elimination through a carefully engineered process that removes acid <br />forming materials (sulfide minerals and heavy metals) from waste rocklore coupled with a reclamation plan that <br />ensures the processing site is neutralized upon cessation of the operation. <br />6.4.20(7)(a) <br />The proposed operation is essentially converting an area containing pre-existing abandoned waste rock into a lined <br />impoundment for processed tailings that are inert and void of acid forming material. As shown in the Waste Stream <br />Characterization analysis within Exhibit C, the proposed operation is extremely effective in achieving this. <br />• <br />Page 4 of 31
The URL can be used to link to this page
Your browser does not support the video tag.