Laserfiche WebLink
E.*V VIA O — Ao0 <br />AFAAGIA(FAF MWO <br />July 20, 2010 <br />Division of Reclamation, Mining and Safety <br />Attn: Michael A. Cunningham, <br />Environmental Protection Specialist <br />1313 Sherman Street, RM 215 <br />Denver, CO 80203 <br />Re: FIRST ADEQUACY REVIEW RESPONSE <br />FILE NUMBER M- 1977 -223 WILEY PIT (AM -01) <br />OPERATOR: JBS Five Rivers Cattle Feeding <br />Dear Mr. Cunningham: <br />IBS Five Rivers Cattle Feeding, LLC - Colorado Beef is proposing the construction of a 354 acre feet <br />reservoir, pump station and transfer line. This project requires construction in, around and below existing <br />structures such as utilities, U.S. Highway 50 and the Amity Canal. All construction activities within the <br />reclamation and mining permit shall comply with the issued engineering construction plans and <br />specifications. <br />The construction and operation of this project will not hinder the function and operation of the existing <br />structures. The Contractor is responsible for complying with the plans and specifications as well as all <br />federal, state and local regulations. Any disturbed features will be restored to original or better condition. <br />Please find the attached preliminary approval letter from the State of Colorado, Department of <br />Transportation regarding the utility permit. The contractor is responsible for attaining the required utility <br />permit for crossing U.S. Highway 50. <br />Should you have any questions or require additional information, please contact me. <br />Sincerely, <br />Gary hapman, P. . <br />Enviro -Ag. Engineering, Inc. <br />enc: CDOT Preliminary Utility Permit Approval Letter <br />cc: File <br />3404 AIRWAY BLVD. • AMARILLO, TEXAS 79118 TEL (806) 353 -6123 FAX (806) 353 -4132 <br />www.enviroag.com <br />