My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_REVISION - M1977223 (13)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977223
>
2010-07-27_REVISION - M1977223 (13)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:22:46 PM
Creation date
7/28/2010 11:36:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977223
IBM Index Class Name
REVISION
Doc Date
7/27/2010
Doc Name
Water System Improvements
From
JBS Five Rivers Cattle Feeding
To
DRMS
Type & Sequence
AM1
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Design of the temporary support of excavation system is the responsibility of the <br />Contractor <br />3. Construction of the support of excavation system shall not interfere with the <br />permanent structure and may begin only after a review by the Owner /Engineer <br />4. Extend shoring and bracing to a minimum of 5 feet below the bottom of excavation. <br />Shore excavations that are carried below elevations of adjacent existing foundations <br />B. Dewatering <br />1. Divert surface water from or prevent it from entering excavated areas or trenches to <br />the extent practical without damaging adjacent property <br />2. Provide and maintain adequate dewatering equipment to remove and dispose of <br />surface and ground water entering excavations, trenches and other areas of work <br />3. Trenches shall be dewatered so that the pipe laying may be performed on dry ground <br />and the foundation for the pipe is not compromised <br />4. The water shall be kept down until the unit or section under construction is complete <br />5. Contractor is responsible for all costs associated with dewatering <br />6. Contractor shall acquire any necessary permits to conduct dewatering operations <br />C. Blasting <br />1. It is anticipated that no material will be encountered that will require blasting; but, <br />should such material be encountered, no blasting will be permitted until proper <br />precautions are taken for the protection of persons and property Authorization for <br />blasting must be received from the proper officials prior to any preparations for <br />blasting <br />2. The Contractor shall be responsible for all damages incurred as a result of blasting, <br />and shall repair any damage immediately at his own expense <br />3. Contractor shalt meet all federal, state, and local requirements <br />D. Excavation <br />1. Maintain the open excavated trench preceding the pipe laying operation and unfilled <br />trench, with pipe in place, to a minimum length which causes the least disturbance and <br />maintains construction progress <br />2. Complete excavation work to grade elevations called for on drawings within a <br />tolerance of + / -0.1' <br />3. Increase depth of pipe, in order to clear any obstructions encountered at normal pipe <br />grades <br />4. Excavate trenches so pipe can be laid straight and on a uniform grade, without dips <br />and bumps, between elevations on the drawings <br />5. Insure trench alignment is such that the pipe is accurately laid to the required pipe <br />alignment and that the pipe is centered within the trench <br />6. Maintain a minimum of 4.0' of cover over top of pipe <br />7. Trench widths <br />a. Excavate the trench to a width that allows for adequate working space and pipe <br />clearances for proper installation <br />b. Maximum trench width from bottom of trench up to 12" above pipe shall be the <br />pipe size plus 24" <br />c. Minimum trench width from bottom of trench up to 12" above pipe shall be the <br />pipe size plus 12" <br />312333 -5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.