My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-27_PERMIT FILE - M2010008
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2010008
>
2010-07-27_PERMIT FILE - M2010008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:51 PM
Creation date
7/27/2010 1:29:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2010008
IBM Index Class Name
PERMIT FILE
Doc Date
7/27/2010
Doc Name
Adequacy Review
From
Eastern Colorado Aggregates
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i?v <br />EASTERN COLORADO AGGREGATES, R.L.L.L.R <br />Main Office: P.O. Box 580 • Aye, CO 81069 Plant: P0. Box 307 • Holly, CO 81047 <br />Phone: 719/489-3385 • Fax 719/489-2268 Phone: 719/537-0117 • Fax 719/537-0115 <br />Equal Opportunity Employer <br />July 26, 2010 NE-ely <br />Division of Reclamat* n, Mining and Safety <br />Attn: Jared Ebert <br />1313 Sherman St., Room 215 40 DivlSien of Reelamatlon, <br />Denver, CO 80203 Mining & Safety <br />RE: Sikes Pit #2; DRMS File No. M-2010-008; 112c Application Adequacy Review <br />Jared, <br />In response to your letters dated April 21, 2010 and May 7, 2010 regarding the Sikes Pit <br />#2, we have the following clarifications: <br />1.) This map must be signed by the registered land surveyor, professional engineer or <br />qualified person who prepared it. <br />A: Please see the attached revised map. <br />2.) The note listed on the map states, "The orientation of the final 3:1 slope is a <br />maximum slope limit, and may vary depending on the life of the operation." Please <br />clarify, will any slopes be reclaimed steeper than a 3:1 horizontal to vertical ratio? <br />A: All mined slopes will be reclaimed to 3:1 or flatter. <br />3.) Are the blue lines depicted on the map contour lines? If so, please label the various <br />elevations and indicate the contour interval. <br />A: Please see the attached revised map. <br />4.) Exhibit G indicates a berm will be built on the north and east side of the permit area <br />to control run off from leaving the mine area. Please depict this berm on the map. <br />A: Please see the attached revised map. <br />5.) The mining plan indicates an asphalt and concrete batch plant will be used within the <br />permit area to process the mined material. Please explain how the surface and ground <br />water system will be protected during processing of the mined material. <br />A: A berm will be constructed around the perimeter of the asphalt plant and or <br />concrete plant to prevent storm runoff from leaving the plant sites.
The URL can be used to link to this page
Your browser does not support the video tag.