Laserfiche WebLink
July 20,2010 C-1981-022/Elk Creek Mine MPB <br /> SUPPORT FACILITIES -Rule 4.04: <br /> The new methane drainage facility located at the Elk Creek Fan bench was inspected and good progress is being <br /> made in construction of the facility. The steel cased methane drainage borehole has been installed,the twin <br /> exhausters are on-site, and the exhauster building is under construction. No problems were identified at the <br /> construction site. Elk Creek is adequately protected by a large berm constructed of boulders. The rocks were <br /> initially used as erosion protection for the North SAE Small Area Exemption. Now the rocks provide a large berm <br /> and sediment control barrier between the methane drainage facility and Elk Creek. <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 3 of 6 <br />