Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />XXXXXXX <br />:.::.: ..........::::::::::.::.............................................. <br />PROJECT IDENTIFICATION <br />Task #: „001-4L State :Colorado Permit/job# : M1974-069 <br />Date <br />User <br />07/13/2010 <br />ECS <br />County :Larimer <br />Site : Larimer Pit <br />Blade type : Universal <br />Abbreviation :none <br />Filename :M069-001 <br /> Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.16 NA <br /> Operating cost/hour : $101.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $198.29 Total fleet cost/hour : $198.29 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,583 LCY factor : NA volume : 11,583 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (a vg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production :- -737.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rf) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,500 feet Material weight : 0.85 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,700 Ibs/LCY Net correction : 0.42 <br /> <br />Weight description : <br />Sand and clay - Loose Adjusted unit production : 312.58 LCY/hr <br /> Adjusted fleet production : 312.58 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 37.06 Hours <br />Unit cost : $0.634 /LCY Total job cost : $7,348 <br />