My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-26_REVISION - M1974069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1974069
>
2010-07-26_REVISION - M1974069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:38:14 PM
Creation date
7/26/2010 1:05:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1974069
IBM Index Class Name
REVISION
Doc Date
7/26/2010
Doc Name
FW Reduction Approval
From
DRMS
To
Loveland Ready Mix Concrete, Inc.
Type & Sequence
SR1
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />OEM=: ...... . .................. .:::::::::::::::::::::::.:.................................. ...................... <br />PROJECT IDENTIFICATION <br />Task #: 001 State : Colorado Permit/job# : M1974-069 <br />Date <br />User <br />County : Larimer <br />Site : Larimer Pit <br />Blade type <br />Attachment no. 1 <br />Attachment no. 2 <br />Abbreviation :none <br />Filename : M069-001 <br />Universal <br />ROPS Cab <br />NA <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $58.16 NA <br /> Operating cost/hour : $101.59 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $198.29 Total fleet cost/hour : $198.29 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 13,500 LCY factor : NA volume : 13,500 LCY <br /> <br />Source of estimated volume :Operator Estimate <br />Source of estimated swell factor : NA <br /> <br /> <br />HOURLY PRODUCTION Xxx <br />Job Condition Correction Factors <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 200 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 737.1 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (a vg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Consolidated stockpile Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (pos) Altitude : 1.00 (Cat HB) <br />Average site altitude : 5,500 feet Material weight : 0.85 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,700 Ibs/LCY Net correction : 0.42 <br />Weight description : <br />Sand and clay - Loose Adjusted unit production : 312.58 LCY/hr <br /> Adjusted fleet production : 312.58 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 43.19 Hours <br />Unit cost : $0.634 /LCY Total job cost : $8,564 <br /> <br /> <br />07/13/2010 <br />ECS
The URL can be used to link to this page
Your browser does not support the video tag.