Laserfiche WebLink
C-1981-008 <br />PR-06 <br />19. Resolved. <br />July 23, 2010 <br />Page 12 of 31 <br />19A. The CCC West Lateral Ditch section (page 2.05.3(3)-46) has not been revised to retain <br />historical information about the Temporary relocation. Please restore and update the <br />language stricken with the May 2010 adequacy response. <br />On Page 2.05.3(3)-46, the map referenced as depicting the location of irrigation features is Map <br />2.05.3(3)-1. Please revise to refer instead to Map 2.05.4-5. <br />The four bulleted items requesting changes to Map 2.05.4-5 have all been resolved. However, <br />the Division does have one comment: for the Lloyd and Benson-West parcels, areas designated <br />as Irrigated Pasture (IP) are rectangular and oriented N-S / E-W. The locations depicted for the <br />gated pipe to irrigate these two areas run due North from the proposed takeout locations. It <br />appears that the proposed layout of gated pipe and IP has been made without regard to the <br />contours of the land. Water will tend to flow from the pipe along the steepest gradient away <br />from the pipe, rather than flowing due west as would be inferred from the map. Please review <br />both the proposed layout of the gated pipe and the configuration of the IP areas and revise as <br />necessary to ensure that those areas seeded with the IP seed mix will be the same areas that are <br />actually irrigated by the gated pipe. <br />20A. Resolved. <br />21. Attachment 2.05.3(3)-8 still has a blank page 24 and duplicate page 27. Please fix these two <br />pagination errors, which will result in the numbering of the TOC being correct. <br />Rule 2.05.3(4) - Ponds, impoundments, other treatment facilities and diversions <br />22.-25. Resolved. <br />26. There still appears to be some mislabeled or incorrectly numbered attachments. The pages <br />contained within Attachment 2.05.3(3)-22 are incorrectly numbered as 2.05.3(3)-14... and the <br />new Attachment 2.05.3(3)-14 sent with the latest response package contains no file. It is <br />unclear what: this attachment is now intended to contain, because previously there were two <br />attachments labeled 2.05.3(3)-14. Please correct these inconsistencies and ensure that all <br />attachments are properly labeled and correctly numbered. <br />27-29. Resolved. <br />Rule 2.05.4(2)(c) Backfilling and Grading Plan <br />30-35. Resolved. <br />36. <br />a. Resolved. <br />b. A revised Attachment 2.05.4(2)(c)-7 has been provided; this portion is resolved. The last <br />sentence of this item requested that, "The locations of any temporary overburden and Bench