My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-22_REPORT - C1980007
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980007
>
2010-07-22_REPORT - C1980007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:16:40 PM
Creation date
7/23/2010 2:47:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
REPORT
Doc Date
7/22/2010
Doc Name
Fall 2009, Q4-08, Q1-09, Q4-09 & Q1-10 Review Checklist
Permit Index Doc Type
Subsidence Report
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
after mining for identifying landslides, rockfalls, <br />vegetation, etc. <br />Monument Dam: <br />E-1 longwall mining was more than one mile from Monument Dam during <br /> the report period; therefore, monthly monitoring and weekly visual <br />Photographed landslides to north and south of dam inspections were not required. <br />either by air or other method, annually. <br /> According to the 4''' quarter 2009 seismic monitoring report, the largest <br />Surveyed monuments on dam and on north, south, seismic event recorded at the West Elk Mine was 0.0006 g, far below the <br />and east edges of reservoir, premining through 0.15 g threshold that requires resurveying Monument dam and the <br />postmining. Frequency: Dam axis either quarterly reservoir; therefore, those activities were not required. <br />or annually (conflicting text in permit), then monthly <br />when E-seam longwall mining is within I mile Appendix D contains the required annual photos of the landslides to the <br />(frequency on reservoir edges is unspecified). <br />north and south of the dam. <br />Visually inspected monument transects (dam and Yes <br />Appendix C of the report contains data that indicates all monitoring <br />reservoir edges) for cracks, 1 month through 2 to 3 frequencies and data requirements were met for Monument Dam and the <br />months after mining in E-1 or E-12. (Frequency not reservoir, including survey data of the dam and edge of the reservoir <br />specified in permit.) collected by the robotic total station, results of visual inspections of the <br /> dam reported on the operator's inspection forms, and piezometer water <br />Measured water levels in dam crest piezometers, level data for the dam. The data indicate no significant movement on the <br />monthly Apr - Oct, when accessible.: dam and some additional movement of the landslide in the area of the <br />Visually inspected dam structure for cracks, weekly south abutment of the dam. <br />while longwall mining is within I mile. The operator has been discussing with DRMS the possible need to revise <br /> the subsidence monitoring plan to increase its clarity. <br />Resurveyed monuments on dam and reservoir edges <br />ASAP when seismic event has PGA >0.15 . <br />Conducted sufficient post- <br />mining monitoring to <br />verify subsidence <br />prediction <br />2.05.6(6I(i))(F) <br />Yes The traverses in the Fall 2009 study included observations of new and previously identified <br />subsidence features. The report describes changes to the previously existing features that have <br />occurred since previous visual inspections. <br /> The Fall 2009 report describes recent surface subsidence activity, including: a) continuing <br /> rockfall and slabbing in the West Flatiron area, b) no new subsidence features in the Box <br /> Canyon area, c) rockfall has largely ceased on the east side of Sylvester Gulch since the Fall <br />Accurately predicted 2.05.6(6)(d)(i) Yes 2008 report, d) mining induced cracks and a sink-hole and non-mining induced cracks in soft <br />subsidence. material at methane drainage wells pads (some features have been regraded), e) complete or <br /> partial healing of some of the subsidence cracks found during previous reporting periods. <br /> These impacts are consistent with the subsidence prediction in the permit application. <br />Prevented imminent or <br />actual material damage or 2.05.6(6)(d)(i) Yes <br />diminution of use of
The URL can be used to link to this page
Your browser does not support the video tag.