Laserfiche WebLink
July 13,2010 C-1981-018/Deserado Mine JHB <br /> had already been cleaned up by the time of the inspection. Other than sediment in the facilities area ditches,the <br /> area had weathered the storm with minimal impact. Ditches need clean out as regular maintenance. Culverts <br /> around the facilities were clear and functional. <br /> TOPSOIL—Rule 4.06 Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; <br /> Redistribution 4.06.4: <br /> RA8,RA7,RA6,RA5 and RA4 were inspected.Vegetative cover is good on all these piles.More <br /> wheatgrass is observed on the topsoil piles them the subsoil stockpiles. RA8 was utilized for berm improvement <br /> for MSHA compliance.The top of RA8 has been graded and shaped.The top has been left as a depression. <br /> Seeding is planned for fall 2010.No noxious weeds were encountered on any of the topsoil or subsoil piles. <br /> SEALING OF DRILLED HOLES AND UNDERGROUND OPENINGS—Rule 4.07 <br /> RECLAMATION PLAN COMPLIANCE—Rule 4.13 <br /> DOCUMENTS RECEIVED <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 1 <br /> Number of Complete Inspections this Fiscal Year: 0 <br /> Page 4 of 9 <br />