My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-19_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-07-19_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
7/19/2010 2:29:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/19/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Reports: Weeks of 06/20/2010 and 06/27/10.
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'O <br />Earth & Environmental <br />H) Low Volume Solution Collection System <br />1) Low Volume Solution Collection Piping <br />Placement of the low volume solution collection system continued at the LVSCF placement <br />area shown in Figure 6, advancing in front of the placement. Four-inch CPeP was placed and <br />sandbagged in accordance with design drawings, constructing the mainline and the tertiary <br />lines. The secondary geomembrane in the area was accepted prior to pipe placement. <br />2) Low Volume Solution Collection Fill (LVSCF) <br />Low volume solution collection fill (LVSCF) material placement within the Phase 5 VLF <br />continued. LVSCF was placed in the area show in Figure 6. The LVSCF was hauled from the <br />processing area to the placement area using CAT 740 haul trucks loaded by a 988 front-end <br />loader. The LVSCF was placed in a 3-foot lift using two CAT D-6 LGP dozers, a CAT D-7 <br />LGP dozer, and a CAT D-8 LGP dozer, expect were haul routes were established. Haul route <br />consisted in five-foot lifts, to be spread into 3-foot lifts later. Laborers were present at all times <br />during placement holding the low volume solution collection piping in place, removing <br />debris/sandbags, and assisting the dozer operator with lift thickness. LVSCF placement was <br />also performed during night shift using the same equipment and procedures. All LVSCF was <br />placed on previously approved secondary geomembrane. AMEC field representatives observed <br />placement constantly during both day and night shifts. <br />1) Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />E Cresson Clay Processing 10,243 155,621 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 10,243 388,025 <br />2) Low Volume Solution Collection Fill Material <br />Processing of LVSCF material is complete. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 0 405,067 Processing in area complete <br />,n Miscellaneous <br />No work was performed during the week. <br />VLF Weekly Report WE 06.26.10.D
The URL can be used to link to this page
Your browser does not support the video tag.