Laserfiche WebLink
amec-0 <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC&V/ Phase 5 <br />Owner: Cripple Creek & Victor Gold Mining Co <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: June 26, 2010 <br />Project No.: 84201125EO <br />Contractor: Ames Construction Co., Inc. <br />Shift: Day/Night <br />Reporting Period: 6/20/10 through 6/26/10 <br />Days S M T WI T F S <br />Work Shifts D D D D D D <br /> E <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Low: 46°F to 58°F (+/-) High: 70°F to 79T (+/-) <br />AMEC CQA: Personnel On-site through the Reporting Period (See Attachment A). <br />AMES: Ames began placing Low Volume Solution Collections Fill during night shift, Monday <br />(6/21/2010). AMEC personnel observed placement constantly and will continue. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />II) EARTHWORKS <br />A) Topsoil <br />1) Stripping <br />No work performed during the week. <br />B) Subgrade Preparation <br />1) VLF <br />Fine grading, moisture conditioning, and compaction of subgrade was performed prior to soil <br />liner fill (SLF) placement during the week. The areas inspected and approved for placement <br />are shown in Figure 2. <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed between stations E10+00 (+/-) and E22+00 (+/-), <br />approximately 0 to 300 feet right of centerline and between stations H0+00 (+/-) and 1-110+00 <br />(+/-), approximately 0 to 400 feet right of centerline. Slope contouring was performed using <br />various CAT dozers and various CAT excavators. The material generated as the cut progressed <br />was pushed down the slope. <br />VLF Weekly Report WE 06.26.10.D