My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-15_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-07-15_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:25 PM
Creation date
7/19/2010 7:34:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
7/15/2010
Doc Name
Weekly Construction Quality Assurance ("CQA") Report: Week of 06/13/2010
From
CC&V
To
DRMS
Type & Sequence
AM9
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec'9 <br />Earth & Environmental <br />,n Material Processing <br />1) East Cresson Clay Borrow Area <br />Processing of SLF material continued this week. A CAT 320 excavator, a CAT 330 excavator, <br />a CAT 950 front-end loader, and tandem-axel haul trucks were used to excavate, haul, and <br />process the material. <br />Location This Week <br />(tons) Cumulative <br />(tons) Comments <br />E Cresson Clay Processing 5,895 145,378 <br />S Cresson Clay Processing 0 201,199 Processing in area complete. <br />Squaw Gulch Processing 0 35,816 Processing in area complete. <br />Total 5,895 377,782 <br />2) Low Volume Solution Collection Fill Material <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D-10 dozer and a skid steer loader were used to process the material. <br />Processing of LVSCF material is complete. <br />Location This Week Cumulative Comments <br /> (tons) (tons) <br />Dump 4 LVSCF Processing 14,616 405,( <br />67 <br />K) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />Confirmatory drilling was finished at Underground Working #3012. A drill pattern was set out by <br />an AMEC field representative. Seven holes were drilled encountering no voids, encapsulating the <br />previously observed working. An approximate total of 350 feet was drilled. The previously <br />observed void was filled with structural fill material from the recent blast in the area. Remediation <br />of UG#3012 is complete. An AMEC representative observed the confirmatory drilling constantly. <br />All known underground workings within the Phase 5 VLF footprint have been remediated in <br />accordance with design drawings and project specifications. <br />B) Mine Shaft/Stope Remediation <br />No work was performed during the week. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />VLF Weekly Report WE 06.19.10.1)
The URL can be used to link to this page
Your browser does not support the video tag.