Laserfiche WebLink
Dudash <br />July 6, 2010 <br />Page 2 <br />In BRL's response five potential monitoring wells are identified but none are appropriately <br />constructed to monitor the B -Seam or the saturated zone above the B -Seam. Only one of <br />these wells can be located on Map 9 Hydrological Monitoring Location Map. Please revise <br />the application materials and revise the Hydrologic Monitoring Plan to demonstrate <br />compliance with Rules 2.04.7 and 4.05.13. <br />Please let me know if you have any questions. <br />C: Sandy Brown <br />