My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-07-06_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/6/2010 9:54:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
7/6/2010
Doc Name
Bond Release Application
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
SL7
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Boulay -2- July 1, 2010 <br />12. <br />13. <br />14. <br />15. <br />16. <br />Dollar Amount Requested for Release: $661,061.00 <br />Legal Description of Area Requested: <br />Township 10 South, Range 98 West, 6th P.M., Mesa County, CO <br />A portion of Sections 26, 27 & 34 <br />A Map Showing Area: Enclosed <br />Dates Reclamation Work Performed: <br />Construct Permanent Flood <br />Control Dike <br />Structure removal <br />Backfill and regrading, <br />coal fines removal, reseeding <br />A description of results achieved: <br />1985 <br />2001, 2008 thru 2010 <br />2003 thru 2010 <br />Reclamation has been completed at the Unit Train Loadout area in which this bond <br />release application addresses. The reclamation was performed as follows: <br />1985 <br />Approval and construction of Permanent Flood Control Dike <br />2001 <br />Overland Conveyor structures were demolished and removed (included: Transfer <br />buildings 3 and 4, Conveyor Tubes, Linear Stacker, Linear Stacker Rail & concrete, <br />conveyor concrete footers, drive building) <br />2003 <br />Backfilling, regrading and seeding of Overland Conveyor Corridor. <br />2008-2009 <br />Loadout Facility structures were demolished and removed (included: Loadout Building, <br />Coal feeders and 60" conveyor belt structures, water tank, fire suppression building) <br />2010 <br />Coal fines removal, backfilling, regrading and reseeding were completed as per approved <br />final contours (included: Pond 1 and 2, sewage lagoons, new road/bridge construction, <br />new facilities construction). <br />The Unit Train Loadout area has been approved as "Industrial" for its post-mining land <br />use. Snowcap's permit states on page 15-2 that installation of the multimillion dollar sand <br />plant, initiating construction of the bridge and new access road and the configuration of <br />the reclaim tunnel as a storage facility would be sufficient to demonstrate that the <br />alternative land use has substantially commenced and is likely to be achieved. All of <br />these items have been initiated or completed. <br />The ten-year minimum period of responsibility in regard to revegetation does not apply. <br />As per DRMS's rule 4.15.10(3), enclosed is the landowner's request to waive the <br />vegetation requirements of rule 4.15.10(2).
The URL can be used to link to this page
Your browser does not support the video tag.