My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-07-06_REVISION - C1981041
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981041
>
2010-07-06_REVISION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:57 PM
Creation date
7/6/2010 9:54:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
REVISION
Doc Date
7/6/2010
Doc Name
Bond Release Application
From
J.E. Stover & Associates
To
DRMS
Type & Sequence
SL7
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 N 7th Street, Unit B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />July 1, 2010 <br />Mr. Mike Boulay <br />Division of Reclamation, Mining and Safety <br />101 South 3rd, Suite 301 <br />Grand Junction, CO 81501 <br />vtc-cel?N XD <br />JUt 0 ? ?,Q10 <br />itEC4? 1q, <br />?,?intn9 and <br />Re: Snowcap Coal Company, Inc. <br />Request for Phase I, II and III Bond Release <br />Permit No. C-1981-041 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />Dear Mr. Boulay: <br />The following information comprises Snowcap Coal Company, Inc.'s application for a phase I, II <br />and III bond release for its Unit Train Loadout Facility, Permanent Flood Control Dike, and <br />portions of its Railroad Spur and Overland Conveyor. <br />1. Date of Request: July 1, 2010 <br />2. Permittee: Snowcap Coal Company, Inc. <br />3. Permit No.: C-1981-041 <br />4. Date Permit was approved: <br />Initial Permanent Program Permit Issuance January 3, 1983 <br />Current Renewal Permit Issued January 3, 2008 <br />5. Mine Name: Roadside North and South Portals <br />6. Phase of Bond Release Requested: Phase I, If and III <br />The purpose of this Bond Release Request is to release those lands within the permit <br />boundary located at the Unit Train Loadout, Permanent Flood Control Dike, Railroad <br />Spur and Overland Conveyor lying north of 1-9/10 Road and having a designation of <br />Industrial as the post mining land use. <br />7. Number of Acres: Approximately 75.2 Acres <br />8. Bond Company: Liberty Mutual Insurance Company <br />9. Bond Number: 014-018-026 <br />10. Current Total Bond Amount: $1,640,413.00 <br />11. Original Total Bond Amount: $1,500,000.00
The URL can be used to link to this page
Your browser does not support the video tag.