Laserfiche WebLink
c-0 <br />ame <br />Earth & Environmental <br />C) Slope Contouring <br />1) VLF <br />Slope contouring was performed in the following areas: between stations A8+00 (+/-) and <br />A30+00 (+/-), approximately 500 feet left of centerline to 15 feet left of centerline; between <br />stations E14+00 (+/-) and E18+00 (+/-), approximately 0 to 150 feet right of centerline; <br />between stations G29+00 (+/-) and G30+00 (+/-), approximately 0 to 150 feet left of <br />centerline; between stations H0+00 (+/-) and H3+00 (+/-), approximately 0 to 100 feet left of <br />centerline; between stations H26+00 (+/-) and H33+00 (+/-), approximately 0 to 400 feet right <br />of centerline; and between stations J12+00 (+/-) and J30+00 (+/-), approximately 300 feet left <br />of centerline to 600 feet right of centerline. Slope contouring was performed using various <br />CAT dozers and various CAT excavators. The material generated as the cut progressed was <br />pushed down the slope. <br />D) Overburden to Stockpile <br />1) VLF <br />No work performed during the week. <br />E) Cut to Fill <br />1) VLF <br />Structural fill placement was performed pushing cut material from between stations J12+00 <br />(+/-) and J15+00 (+/-), approximately 0 to 75 feet right of centerline to an adjacent fill between <br />stations J12+00 (+/-) and J15+50 (+/-), approximately 0 to 75 feet left of centerline. Cut/fill <br />operations were performed using a CAT D-8 dozer. Structural fill was placed in 18" to 24" <br />lifts. Each lift was moisture conditioned using a CAT 773 water truck (when necessary) and <br />compacted using a 10-ton vibratory smooth drum compactor, passing over the entire fill <br />surface at least 4 times (method compaction technique was applicable). <br />No blast pattern drilling or blasting was performed during the week. <br />F) Soil Liner Fill <br />1) VLF <br />Soil liner fill (SLF) placement continued in the areas shown in Figure 3, hauling from the East <br />Cresson Clay borrow. Subgrade was approved and moisturized prior to placement using a <br />tandem-axel water truck. Placement was performed using two CAT D-6 dozers, and one CAT <br />skid steer loader in a one-foot compacted lift. Moisture conditioning was performed using a <br />tandem-axel water truck and compaction was performed using a 10-ton vibratory smooth drum <br />compactor. Nuclear density testing, moisture verification, and depth checks were performed in <br />the geomembrane deployment areas throughout the week. All test results were within project <br />specifications and all test locations were surveyed by Ames. <br />SLF material was hauled from the East Cresson Clay borrow area and stockpiled near stations <br />A28+00 (+/-), approximately 200 feet left of centerline. Material was hauled using CAT 777 <br />haul trucks loaded by a CAT 385 excavator. <br />VLF Weekly Report WE 06.12.10.D