Laserfiche WebLink
OGCC <br />of America <br />June 30, 2010 <br />tweEI Y E® <br />JUN 3 Q ?010 <br />Division of Reclamation, <br />Berhan Keffelew Mining & Safety <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />1313 Sherman St. Room 215 <br />Denver, CO 80203 <br />Re: M-2002-004, GCC Rio Grande, Inc., Pueblo Portland Cement Plant <br />As Built Drawings Submittal <br />Dear Mr. Keffelew: <br />Pursuant to the pending information requests discussed in the Colorado Division of <br />Reclamation, Mining and Safety (the "Division") letter to GCC Rio Grande, Inc. (GCC) <br />dated June 9, 2010 (the "Letter"), GCC respectfully submits those certain documents, listed <br />below, to supplement and update the Division's current reclamation records for GCC's <br />Pueblo Portland cement manufacturing facility (the "Facility"). <br />This submittal is intended to provide the Division with updated and current information <br />regarding structural modifications and additions at the Facility which have increased GCC's <br />potential Facility reclamation amounts since GCC received its original reclamation <br />approval from the Colorado Mined Land Reclamation Board (MLRB). Given the volume <br />of information included in this submittal, if the Division would like to discuss any of the <br />information provided or if additional information would assist in its review, GCC <br />representatives will promptly avail themselves. <br />Included in this submittal please find the following documents: <br />1. Facility diagram naming and identifying the location of each the additional <br />structures, as well as each of the modified structures at the Facility; <br />2. Reclamation cost analysis itemizing reclamation costs for each of the Facility's <br />additional and modified structures, as well as the Facility's aggregate additional <br />reclamation cost; <br />3. Unit cost estimate data spreadsheet which supplements the enclosed reclamation <br />cost analysis, providing specific RSM Code descriptions; <br />4. As built drawings for each of the modified and additional structures. Drawings <br />for the structures are numbered to correspond with the respective number <br />assigned to each structure on the Facility diagram; and <br />1+?s ?, LO 1-10 <br />?t IfQ?