Laserfiche WebLink
Photo 7—Recently constructed for corridor for elevated product conveyors P3 and P5 (in foreground) <br /> and trestle supports for ROM Feed Conveyor PR-2 (in background). Topsoil stripped from the product <br /> conveyor corridor is stored along the sides of the corridor and is covered with straw mat. Straw mat <br /> also is in place on the embankment of the feed conveyor. <br /> I ' do <br /> �f <br /> Photo S—Construction of stacktube ST-5 at location of recently removed pond MB-2R at western toe <br /> of Lower Refuse Pile. <br /> 8 <br />