Laserfiche WebLink
i <br /> Photo 5—Sediment Pond 002 in Sylvester Gulch. <br /> Photo 6—Ongoing construction of Coal Preparation Plant on Lower Refuse Pile(right center of photo) <br /> as viewed from ridge on east side of Sylvester Gulch. Bare area with equipment in lower left of photo <br /> is the active subsoil stockpile where subsoil material is stored for use in construction activities. <br /> 7 <br />