Laserfiche WebLink
Proposed Bond <br />The temporary 50 gpm system will be owned by WRT and they will be responsible for removing the <br />system from the property once treatment has stopped approximately July 31, 2010. The equipment <br />will be used on another water treatment project in Colorado and WRT will arrange for all shipping at <br />no cost to Colorado. The equipment is of commercial value and will not be abandoned by WRT. <br />Cotter believes for the above conditions no bond amount is appropriate based on the following. <br />Cotter has prepaid equipment rental, initial reagent (IX beads) purchase and mobilization costs. The <br />only remaining cost is for system operation which will occur between July 3, 2010 and July 31, <br />2010. If DRMS approves this technical revision and Cotter is allowed 30 days to fund the amount, <br />then the activity will already have occurred and Cotter would be asking to retrieve the bond amount. <br />Cotter requests that no bond amount be set for the above, short-term activities. <br />5