My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-28_REVISION - C1981019 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2010-06-28_REVISION - C1981019 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:14:08 PM
Creation date
6/29/2010 9:43:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
REVISION
Doc Date
6/28/2010
Doc Name
Exhibit 2 2008 Phase III Bond Release Evaluation -Year 2
From
Colowyo Coal Company
To
DRMS
Type & Sequence
SL5
Email Name
JRS
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.5 Samule Adeauacv Determination <br />Sampling within each managerial unit was conducted to a minimum of 20, 30, or 45 samples per <br />unit. From these preliminary efforts, sample means and standard deviations for total non - overlapping <br />vegetation ground cover, production, and woody plant density were calculated. For non - monitoring <br />applications, the typical procedure is that sampling must continue until an adequate sample, n m i n , has <br />been collected in accordance with the Cochran formula (below) for determining sample adequacy, <br />whereby the population is estimated to within 10% of the true mean (u) with 90% confidence. <br />When the inequality (nmin 5 n) is true, sampling is deemed adequate; and n min is determined as <br />follows: <br />nmin = ( t252) / (0.1 X )2 <br />where: n = the number of actual samples collected (initial size = 20, 30, or 45) <br />t = the value from the one - tailed t distribution for 90% confidence with n -1 <br />degrees of freedom; <br />s = the variance of the estimate as calculated from the initial samples; <br />x = the mean of the estimate as calculated from the initial samples. <br />If the initial samples do not provide a suitable estimate of the mean (i.e., the inequality is false), <br />additional samples would be collected until the inequality (n 5 n) becomes true. <br />Cedar Creek Associates, Inc. Page 14 Colowyo Mine - Bond Release Evaluation <br />Phase III Year 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.