My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-06-25_REVISION - M1986061
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1986061
>
2010-06-25_REVISION - M1986061
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:06:15 PM
Creation date
6/29/2010 8:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1986061
IBM Index Class Name
Revision
Doc Date
6/25/2010
Doc Name
Amendment approval
From
DRMS
To
Oldcastle SW Group, Inc.
Type & Sequence
AM2
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : DRMS <br />Permit or other job action :Amendment AM-2 <br />Task description :Reduce highwall to final gradient <br /> <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11- 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source: (CRG) <br /> Utilization % - <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />...... <br />MATERIAL QUANTITIES ...... ..... <br />Initial Swell Loose <br />volume : 63,889 CCY factor : 1.165 volume : 74,431 LCY <br /> <br />Source of estimated volume :application <br />Source of estimated swell factor :na <br /> <br />.:. _ ...:; ...... <br />... <br />HOURLY PRODUCTION Job Condition Correction Factors <br /> <br />Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shift/day) <br />Compacted fill or embankment Spoil pile: 0.80 (fnd-rt) <br /> Push gradient : 1.60 (Cat HB) <br />Average push gradient : 30.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,700 feet Material weight : 0.79 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,900 Ibs/LCY Net correction : 0.57 <br />Weight description : <br />Decomposed rock - 50% Rock, 50% Earth Adjusted unit production : 485.13 LCY/hr <br /> Adjusted fleet production : 485.13 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 153.42 Hours <br />Unit cost : $0.336 /LCY Total job cost : $24,993 <br />
The URL can be used to link to this page
Your browser does not support the video tag.