Laserfiche WebLink
CIRCES Cost Estimatinq Software <br />BULLDOZER WORK <br />.. .::.... ....... . <br />PROJECT IDENTIFICATION <br />Task # : 002 State : Colorado Permit/job# : M-1986-061 <br />Date <br />User <br />06/25/2010 <br />RCO <br />County :La Plata <br />Site : Cuanini Pit <br />Abbreviation :none <br />Filename :M061-002 <br />Agency or organization name: DRMS <br />Permit or other job action :Amendment AM-2 <br />Task description : Move overburden to center pivot field <br />.. <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200,1 Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />.. . . .. _ .. <br />MATERIAL QUANTITIES .......:.:.:::..:.:.. <br />Initial Swell Loose <br />volume : 133,333 LCY factor : NA volume : 133,333 LCY <br />Source of estimated volume :application <br />Source of estimated swell factor : NA <br /> <br /> <br />HOURLY PRODUCTION ... <br />Job Condition Correction Factors <br />Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 0.00 % () <br />Average site altitude : 6,700 feet <br />Material weight : 2,550 Ibs/LCY <br />Weight description <br />Earth - Dry packed <br />Operator skill : 0.75 _ (avg.) <br />Material consistency : 1.10 (Cat HB) <br />Dozing method : 1.00 (gen.) <br />Visibility: 1.00 (avg.) <br />Job efficiency : 0.83 (lshifbday) <br />Spoil pile: 0.80 (fnd-rt) <br />Push gradient : 1.00 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.90 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.49 <br />Adjusted unit production <br />Adjusted fleet production <br />421.11 <br />421.11 <br />LCY/h r <br />LCY/h r <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 316.62 Hours <br />Unit cost : $0.387 /LCY Total job cost : $51,578