My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_PERMIT FILE - C1980007A (8)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-04-26_PERMIT FILE - C1980007A (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:44 PM
Creation date
6/28/2010 2:19:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
4/26/2010
Doc Name
Geotechnical Monitoring Plan
Section_Exhibit Name
Exhibit 82 Appendix C
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* "Each event" is within the first 6 months and every 6 months over the first two years of <br />operation. <br />Initial sampling and testing of the refuse material will be conducted during the first six months of the <br />CPP operation. Refuse material sampling and testing will be conducted every six months after the <br />initial testing period for the first two years of the CPP operation. The number of tests identified <br />above will be completed for each sampling event. Additional testing will be conducted after the first <br />two years of operation only when there is an apparent change in the nature of the refuse. <br />Analysis <br />Stability analyses will be performed during the first 6 months and periodically thereafter if necessary, <br />depending upon the monitoring and testing results. <br />• <br />P:\Mpls \06 CO \26 \06261003 MCC Refuse Pile Site Review & Permit \WOrkFlles\Permit Application\Appendix C Monitoring Plan\Monitoring <br />Plan.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.