My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_PERMIT FILE - C1980007A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-04-26_PERMIT FILE - C1980007A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:44 PM
Creation date
6/28/2010 2:18:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
4/26/2010
Doc Name
Refuse Pile Expansion East
Section_Exhibit Name
Exhibit 82 Refuse Pile Expansion East
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />8.0 Reclamation P lan <br />The refuse pile will be progressively reclaimed in accordance with the CDRMS Rule 2.05.4 during <br />operations. The features will be restored to complement the surrounding landscape and avoid, <br />minimize, and /or mitigate, potential environmental impacts. Reclamation of the RPE East will <br />include vegetative soil distribution, revegetation, and road removal. <br />8.1 Reclamation Plan Components <br />The following tasks will be undertaken as parts of site reclamation. <br />8.1.1 Vegetative Soil Redistribution <br />Vegetative soil will be removed and stored as indicated in Section 4.1. Redistribution of vegetative <br />soil will occur progressively as the lower and successive benches of the RPE East are built to final <br />grade and are ready to be reclaimed, as required by Rule 4.13, Contemporaneous Reclamation. The <br />outside surface of the refuse pile will be roughened if necessary and the vegetative soil spread in an <br />average of 18" to 24" in depth over the surface. Fertilizer will be applied to the redistributed <br />vegetative soil if the need for additional nutrients is determined. <br />8.1.2 Revegetation <br />After vegetative soil has been spread over the constructed RPE East area benches to be reclaimed, the <br />area will be seeded with MCC's permanent native seed mix by broadcasting or hydroseeding. <br />Seeding will occur the first normal period favorable for planting after each segment of the RPE East <br />has been built to final grade and covered with soils. The seeded area will be mulched and anchored. <br />Noxious weeds will be controlled accordance with the approved plan in MCC's approved permit. <br />8.1.3 Road Removal <br />In accordance with the Rules, after the RPE East refuse pile has been fully completed and reclaimed <br />the haul roads that are no longer needed to access monitoring instruments or for other maintenance <br />needs will be closed to vehicular traffic, culverts will be removed, and the reclamation will be <br />completed in accordance with Rule 4.03.1(7)(a) . The roads will be covered with vegetative soil and <br />seeded with MCC's permanent native seed mix. <br />�s <br />Revised March 19, 2010 � ��- <br />7i l <br />P:\Mpls \06 CO \26 \06261003 MCC Refuse Pile Site Review & Permit \WorkFiles\Permit Application \Text \2010- 04- 19_RPE East Perrrut Appacauon.aocjL <br />
The URL can be used to link to this page
Your browser does not support the video tag.