My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-04-26_PERMIT FILE - C1980007A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980007
>
2010-04-26_PERMIT FILE - C1980007A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:08:44 PM
Creation date
6/28/2010 2:18:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007A
IBM Index Class Name
Permit File
Doc Date
4/26/2010
Doc Name
Refuse Pile Expansion East
Section_Exhibit Name
Exhibit 82 Refuse Pile Expansion East
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.8.1 Buttress and Underdrain Construction Inspection <br />The RPE East refuse pile construction will be inspected at least quarterly by a by a registered <br />engineer or other qualified professional specialist experienced in construction of earth and rockfill <br />embankments under the direction of a qualified professional engineer. Construction inspection <br />activities will include observation to confirm the following activities are performed in accordance <br />with the approved permit design and specifications: <br />(1) Removal of all organic material and topsoil <br />(2) Placement of underdrainage systems <br />(3) Installation of surface drainage systems <br />(4) Placement and compaction of fill materials, and <br />(5) Revegetation <br />A certified report will be submitted to the CDRMS within 2 weeks after each inspection. The report <br />will state whether the fill has been constructed as specified in the approved design. The report will <br />also include a description of any appearances of instability, structural weakness, or other hazardous <br />conditions observed during the inspection. MCC will retain a copy of the report at the West Elk <br />Mine offices. <br />Reports addressing the underdrain system and protective filters will include color photographs taken <br />during and after construction, but before underdrains are covered with excess spoil. Since <br />construction of a new phase of underdrain system is planned every one to two years, each <br />construction phase will be certified separately. The color photographs accompanying each certified <br />report will be taken in adequate size and number with enough terrain or other physical features of the <br />site shown to provide a relative scale to the photographs and to specifically and clearly identify the <br />site. <br />4.8.2 Routine Quarterly Refuse Pile Inspections <br />The refuse pile will be inspected quarterly by a by a qualified registered engineer, or other qualified <br />professional specialist under the direction of the professional engineer, experienced in construction <br />of similar earth and waste structures, approved by the Division. Inspections will be conducted <br />Revised April 2, 2010 P n <br />23 <br />PA\Mpls \06 CO \26 \06261003 MCC Refuse Pile Site Review & Permit \WorkFiles\Permit Application \Text \2010- 04- 19_RPE East Permit Application.doc20 <br />