My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1981019 (47)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981019
>
_INSPECTION - C1981019 (47)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2020 2:46:04 PM
Creation date
6/28/2010 8:25:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
INSPECTION
Doc Name
Inspection Report
Inspection Date
6/15/2010
Email Name
JRS
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colowyo C-1981-019 <br /> 15 June 10 <br /> Pg 10/12 <br /> Topsoil: - During the inspection the Division dug five topsoil test holes in the Gulch A <br /> reclamation area. This is the area where Colowyo has applied for a Phase II Bond <br /> Release (Partial Phase 1/11 Bond Release SL-04, received on 1 June 2010). These five <br /> topsoil test holes are the first of approximately 20 the Division plans on digging in the <br /> East Pit Phase 11 Bond Release area to determine if Colowyo has met the required 18 <br /> inches of topsoil replacement. The following chart shows the hole ID, its location and <br /> the depth of the topsoil. The five test holes averaged 16.5 inches of topsoil. **See <br /> pictures at the end of this report.** <br /> Location Depth Northing Easting <br /> EP-TS-2010-01 16 4458030.603 261581.912 <br /> EP-TS-2010-02 16.5 4458199.139 261660.380 <br /> EP-TS-2010-03 12 4458418.810 261739.094 <br /> EP-TS-2010-004 19 4458531.834 261610.944 <br /> EP-TS-2010-05 19 4458254.792 261337.307 <br /> - Colowyo has started to replace the topsoil on the 2010 West Pit reclamation area. <br /> They have just started the replacement. Once all of the topsoil has been replaced <br /> on this area the Division will dig random test holes to verify that the topsoil was <br /> replaced in accordance with the approved reclamation plan. <br /> - The Division will be proposing a decision to approve Colowyo's Technical Revision <br /> 82, which is a variable topsoil replacement plan. The plan allows for more shallow <br /> topsoil replacement (approximately 6 inches) on ridges and steeper slopes. The <br /> topsoil depths will become gradually thicker down the slope to a maximum of up to <br /> several feet in the South Taylor Pit area. The revised topsoil replacement plan <br /> includes a detailed field verification and reporting plan. Prior to the variable topsoil <br /> replacement plan Colowyo had two different topsoil replacement plans. The first <br /> plan was to replace a minimum of 18 inches of topsoil. This plan was in place from <br /> the beginning of mining until 2005. In 2005 Colowyo conducted a new topsoil survey <br /> and found that they did not have enough topsoil to replace 18 inches on the <br /> remaining East Pit and West Pit reclamation. With the approval of Technical Revision <br /> 82 (approved on 29 May 2006) Colowyo will replace 8 inches of topsoil on reclaimed <br /> lands. The 8 inch topsoil replacement requirement applies to areas where topsoil <br /> was replaced from 2006 through 2009. <br /> - The Division requested that Colowyo heavily rip the area of the West Pit that was <br /> backfilled and graded in 2007. This area has gone through several freeze-thaw <br /> cycles and the backfilled area is very compact at this point. If Colowyo replaces <br /> topsoil on this area without first ripping it the topsoil could slide and there will be very <br /> poor to no root penetration. On the inspection the Division discussed this with Matt <br /> Guptill and he stated that Colowyo would rip this area. <br /> General Mine Plan Compliance: - The 101 dragline was back on the edge of the East <br /> Pit highwall. No additional reclamation has been completed on the East Pit highwall <br /> and Colowyo has shut off power to the 101 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.