Laserfiche WebLink
CIRCES Cost Estimating Software <br /> WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 01a State : Colorado Permit/job # : M-1980-136 <br />Date : 06/10/2010 County : Eagle Abbreviation :none <br />User : DMC Site : Chambers Pit Filename : M136-O1 a <br />Agency or organization name : DRMS -- <br />Permit or other job action 112c SDG <br />Task description : Transport backbll material from stockpiles to pit wall <br />HOURLY EQUIPMENT COST Basic machine : CAT 98OG (2001) Horsepower : 300 <br />Attachment no. 1 : ROPS Cab Shift basis : _ i per day <br />Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $41.36 NA <br />Operating cost/hour : $37.71 75 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $117.79 Total fleet cost/hour : $117.79 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 370,000 LCY factor : NA volume : 370,000 LCY <br />Source of quantity take-off :Attached <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.600 minutes <br />Cycle Time Factors Factor (Tin.) Source <br />Material : Material up to 118" diameter 0.020 <br />Stockpile : Conveyor or dozer piled 10 ff. high or less 0.010 <br />Truck ownership : Common ownership of trucks and loaders 0.040 <br />Operation : Constant operation -0.040 <br />Dump target : Nominal target 0.000 NeI GYGItl un ro au?wu ncnL . ...... <br />ted basic cycle time : 0.550 minutes <br />Adjus <br />Rolling Resistance - Road Conditions <br />Haul :Firm, smooth, rolling, dirt/It. surfaced, watered, maintained <br />Return :Firm, smooth, rolling, dirt/It, surfaced, watered, maintained <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />M Travel time <br />(minutes) Data <br />Source <br />Haul route : 1,100 2.00 3.00 5.00 0.8637 (Cat HB) <br />Return route : 1,100 -2.00 3.00 1.00 0.6531 (Cat HB) <br /> 1UW' U.- unit/ ,........ ..._.---- <br />Loader Bucket Capacity Total cycle time : 2.067 minutes <br />Rated capacity : 7.00 LCY (heaped) (Cat HB) <br />Bucket fill factor : 0.975 Loose material - uniform aggregates to 118" (95- 100%) <br />Adjusted capacity : 6.83 LCY <br /> Source <br /> Altitude adjustment factor : 1.00 (Cat HB) <br />Job Condition Correction Factors f 83 <br />0 (1 shift/day) <br />Site altitude : 6,550 feet actor : <br />Job efficiency . <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 198.13 <br />__ LCY/Hr <br />Adjusted hourly unit production F64 .44 <br />: LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 164.44 LCY/Hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 2250.01 Hours <br />Unit cost : $0.716 /LCY Total job cost : $265,022 <br />