Laserfiche WebLink
Total Volume of fill material transported from stockpile areas to pit wall is approx. = 1,530,000 <br />ft.3 + 8,460,000 ft.3 = 919901000 ft.3 = 370,000 ydS.3 <br />Volume calculated assuming a 1H:1V initial pit slope estimated from onsite observations of the <br />mining occurring in area E during a June, 2010 inspection. <br />Fill material stockpiles to be located in Area D, roughly 1,000-1,200 ft. avg. from pit wall. Use <br />11100 ft. haul length for calculation.