Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION I DEMOBILIZATION <br />sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 07b State : Colorado Permit/job #:M-1980-136 <br />Date : 0611112010 County :Eagle Abbreviation :none _ <br />User : DMC Site: Chambers Pit Filename :M136-07b <br />Permit or other job action :112C Sdg <br />Task description : Secondary seeding mobilization <br /> <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUiPMt rv i <br />i <br />T <br />DOT permit <br />Machine <br />Description <br />-Reveg tractor Weight/unit <br />(Tons) <br />10.00 Ownership <br />Cost/hr/unit <br />$10.00 Haul Rig <br />Cost/hr/unit <br />$88.67 Fleet Size <br />(No. units) <br />1 Haul Trip <br />Cost/hr/fleet <br />$98.67 r <br />p <br />Return <br />Cost/hr/fleet <br />$88.67 Cost/fleet <br />$0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Subtotals : $98.67 $88.67 $0.00