Laserfiche WebLink
sheet 2 of 2 <br />KUTAur+oL.F- <br />Machine <br />Description <br /> <br />-Flatbed Truck, 4x2, 30K GVW <br />Total <br />Cost/hour/unit <br /> <br />$43.79 <br />Fleet Size <br />(No. units) <br />1 <br />Haul Trip <br />Cost/hr/fleet <br />$43.79 <br />Return Trip <br />Cost/hr/fleet <br />$43.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> --- <br />Subtotals : $43.79 <br />1 $43.79 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Eagle <br />Transportation Cycle Time : Non- Total one-way travel distance : 5.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.14 0.14 Total non-roadable mob/demob cost $1,145.36 <br />Return time (hours) = 0.14 0.14 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $12.51 <br />Unloading time (hours) = 0.50 NA ** one round trip, no haul rig <br />Subtotals = 1.29 0.29 <br />JOB TIME AND COST <br />Total job time : <br />2.57 hours <br /> Total job cost : $1,158