Laserfiche WebLink
Items specified for the Reclamation Plan in Rule 6.4.5.(1) and 6.4.5.(2)f. have <br />been included in other items in this Exhibit or have been included in other Exhibits <br />referenced above, and therefore are not separately listed in this exhibit. <br />CURRENT RECLAMATION STATUS <br />Refer to Map F-1. Of the present 46 acres of affected land, approximately 9.5 acres <br />has been reclaimed as of May 2010, including 8.7 acres planted to grass and 0.8 <br />acres of roads and drainage systems completed. However, no request has been <br />made to release reclaimed areas in part or fully. Approximately 28.3 acres has been <br />backfilled and graded to final proposed contours, but either does not require soil <br />(ponds and roads) or has not had soil placed on the surface. Approximately 5.6 <br />acres has been backfilled but not yet graded to final configuration. <br />Exhibits for 112(c) AM-02 Application -M-1994-108-2010- Page 26