Laserfiche WebLink
Ms. Loretta Pineda <br />RE: Technical Revision <br />June 18, 2010 <br />Page 2 of 2 <br />During the leak test, Deere and Ault obtained water level data which was submitted to DBMS as <br />part of their. report of May 23, 2006- We will utilize this data to establish a baseline for <br />comparison.to subsequent water level measurements. We propose to report the data in tabular <br />form along with the prior baseline .data. Attached is our proposed reporting format. <br />This concludes the request for a Technical Revision for Brannan Pit #29. If you have questions <br />or need additional information; please call me at. you convenience. <br />Cordially, <br />Applegate Group, Inc. <br />Tom Hatton, PG <br />_Senior Project Engineer <br />Enclosures <br />TH/ta <br />cc: Gene Riordan <br />Fred Marvel <br />AG File No. 10-116 <br />NA10116 Brannan Pit #29\Disciplines (Technical)\WRPM\Water Rights\TR request.docx