My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />.... _ .. <br />PROJECT IDENTIFICATION <br />Task #: 038 State : Colorado Permit/job# : C- 2006 -085 <br />Date : <br />User: <br />03/17/2010 <br />JRS <br />County : Fremont <br />Site :Northfield Mine <br />Blade type Semi - Universal <br />0.75 <br />Dozer(s) <br />Attachment no. 1 : ROPS Cab <br />Shift basis : <br />1 per day <br />Attachment no. 2: 3-shank ripper <br />(Cat HB) <br />Dozing method: <br />1.00 <br />. Data source : <br />(CRG) <br />Visibility: <br />Utilization % <br />Cost Breakdown:, Ownership cost/hour : $53.74 <br />NA <br />0.83 <br />Operating cost/hour : $70.63 <br />100 <br />Spoil pile: <br />Ripper op. cost/hour : $0.00 <br />0 <br />(fnd -rf) <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $162.90 <br />Total fleet cost/hour : <br />$162.90 <br />MATERIAL QUANTITIES <br />Initial Swell <br />Loose <br />0.79 <br />volume: 175 CCY factor : 1.165 <br />volume: 204 <br />LCY <br />Source of estimated volume Exhibit V <br />(S /SU /U) <br />Source of estimated swell factor CAT Handbook <br />0.34 <br />Adjusted unit production : <br />HOURLY PRODUCTION Job Condition Correction Factors actors <br />Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY /hr <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient: 2.00 % (l <br />Average site altitude : 5,400 feet <br />Material weight: Z900 Ibs /LCY <br />Weight description: <br />Decomposed rock - 50% Rock, 50% Earth <br />JOB TIME AND COST <br />Operator skill : <br />0.75 <br />Dozer(s) <br />(avg.) <br />Material consistency: <br />0.90 <br />$0.555 <br />(Cat HB) <br />Dozing method: <br />1.00 <br />(gen.) <br />Visibility: <br />1.00 <br />(avg.) <br />Job efficiency: <br />0.83 <br />(1shift <br />Spoil pile: <br />0. 80 <br />(fnd -rf) <br />Push gradient: <br />0.97 <br />(Cat HB) <br />Altitude : <br />1.00 <br />(Cat HB) <br />Material weight: <br />0.79 <br />(Cat HB) <br />Blade type : <br />1.00 <br />(S /SU /U) <br />Net correction : <br />0.34 <br />Adjusted unit production : <br />293.72 <br />LCY /hr <br />Adjusted fleet production : <br />293.72 <br />LCY /hr <br />Fleet size : <br />1 <br />Dozer(s) <br />Total job time : <br />0.69 Hours <br />Unit cost: <br />$0.555 <br />/LCY <br />Total job cost: <br />$113 <br />Abbreviation : none <br />Filename : C085 -038 <br />
The URL can be used to link to this page
Your browser does not support the video tag.