My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />4.05 <br />Permit or other job action : Technical Revision 1 <br />Average ripping width : <br />Task description : Rip South Fan Area <br />feet/pass <br />Average ripping length : <br />HOURLY EQUIPMENT COST <br />feet/pass <br />Basic machine Cat D9R - 9SU (2005) <br />Horsepower: 405 <br />Blade type Semi - Universal <br />Average maneuver time: <br />Attachment no. 1 : ROPS Cab <br />Shift basis: 1 per day <br />Attachment no. 2 : -shank ripper <br />0.512 <br />acres /hour <br />Data source : (CRG) <br />3,344.00 <br />Utilization % <br />Cost Breakdown: Ownership cost/hour : $67.87 <br />NA <br />Dozer operating cost/hour : $95.29 <br />100 <br />Ripper operating cost/hour : $9.33 <br />100 <br />Operator cost/hour : $38.54 <br />NA <br />Total unit cost/hour : $211.04 Total fleet cost/hour : $211.04 <br />MATERIAL QUANTITIES <br />Selected estimating method : <br />Area <br />Alternate methods - <br />Seismic: NA NA Load factor: NA Bank volume: <br />NA BCY <br />Area : 0.25 acres Rip depth (ft) : 2.00 Volume: <br />807 BCY or CCY <br />Source of estimated quantity : Map 12 <br />Source of estimated load factor : <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second <br />Unadjusted production <br />Unadjusted production : NA cu. yds. /hour <br />per selected method : <br />3,344.00 cu. yds. /hour <br />Area : Avg. ripping depth : <br />4.05 <br />feet/pass <br />Average ripping width : <br />6.08 <br />feet/pass <br />Average ripping length : <br />50.00 <br />feet/pass <br />Average dozer speed : <br />88.00 <br />feet/minute <br />Average maneuver time: <br />0.25 <br />minutes /pass <br />Production per unit area : <br />0.512 <br />acres /hour <br />Unadjusted production : <br />3,344.00 <br />cu. yds. /hour <br />JOB TIME AND COST <br />Site altitude <br />Altitude adjustment <br />Job efficiency factor <br />Net job correction <br />5,400 <br />1.00 <br />feet <br />(Cat HB) <br />0.83 <br />(1 shift/day) <br />0.83 <br />multiplier <br />Adjusted unit production : 2, 775.52 cu. yds. /hour <br />Adjusted fleet production : 2,775.52 cu. yds. /hour <br />Fleet size: <br />1 <br />dozer(s) <br />Total job time: <br />0.29 hours <br />Unit cost : <br />$0.076 <br />per cu. yd. <br />Total job cost : <br />$61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.