My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-05-07_PERMIT FILE - C2006085 (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C2006085
>
2010-05-07_PERMIT FILE - C2006085 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:11:37 PM
Creation date
6/15/2010 5:11:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2006085
IBM Index Class Name
Permit File
Doc Date
5/7/2010
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Exhibit AL
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Blade type Semi - Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 perday <br />Attachment no. 2: 3-shank ripper <br />Data source : (CRG) <br />• <br />Average maneuver time: 0.25 minutes /pass <br />Production per unit area : 0.811 acres /hour <br />Unadjusted production : 3,440.20 cu. yds. /hour <br />JOB TIME AND COST <br />Adjusted unit production: 2,855.37 cu. yds. /hour <br />Adjusted fleet production : 2,855.37 cu. yds. /hour <br />Fleet size : <br />1 <br />Utilization % <br />Total job time : <br />36.10 hours <br />Cost Breakdown: <br />Ownership cost/hour: <br />$66.25 <br />NA <br />$7,475 <br />Dozer operating cost/hour : <br />$95.29 <br />100 <br />Ripper operating cost/hour : <br />$6.95 <br />100 <br />Operator cost/hour : <br />$38.54 <br />NA <br />Total unit cost/hour: <br />$207.03 Total fleet cost/hour: <br />$207.03 <br />MATERIAL QUANTITIES <br />Selected estimating method : <br />Area <br />Alternate methods <br />Seismic: NA <br />NA Load factor: <br />NA Bank volume: <br />NA <br />BCY <br />Area : 21.30 <br />acres Rip depth (ft) : <br />3.00 volume : <br />103,092 <br />BCY or CCY <br />Source of estimated quantity : Map 12 <br />Source of estimated load factor: NA <br />HOURLY PRODUCTION <br />Alternate methods - <br />Job Condition Corre Factors - <br />Seismic : Seismic velocity: <br />NA feet/second <br />Unadjusted production <br />Unadjusted production : <br />NA cu. yds. /hour <br />per selected method: <br />3,440.20 <br />cu. yds. /hour <br />Area : Avg. ripping depth : <br />2.63 feet/pass <br />Site altitude : <br />5,400 <br />feet <br />Average ripping width: <br />7.67 feet/pass <br />Altitude adjustment: <br />1.00 <br />(Cat HB) <br />Average ripping length : <br />150.00 feet/pass <br />Job efficiency factor: <br />0.83 <br />(1. shift/day) <br />Average dozer speed: <br />88.00 feet/minute <br />Net job correction : <br />0.83 <br />multiplier <br />Average maneuver time: 0.25 minutes /pass <br />Production per unit area : 0.811 acres /hour <br />Unadjusted production : 3,440.20 cu. yds. /hour <br />JOB TIME AND COST <br />Adjusted unit production: 2,855.37 cu. yds. /hour <br />Adjusted fleet production : 2,855.37 cu. yds. /hour <br />Fleet size : <br />1 <br />dozer(s) <br />Total job time : <br />36.10 hours <br />Unit cost: <br />$0.073 <br />per cu. yd. <br />Total job cost: <br />$7,475 <br />al <br />
The URL can be used to link to this page
Your browser does not support the video tag.