Laserfiche WebLink
• Table 2.05.3 -2, Cont. <br />Main Power Lines and Substation <br />Overhead, poles on approx. 200 ft. <br />centers, approximate length 600 ft., 3 <br />conductor with neutral conductor. <br />Substation on surface with 3 each step - <br />down transformers, and 2 each power <br />interrupt units. <br />Fan Power line Overhead, poles on approx. 200 ft. <br />centers, approx. length 2,600 ft., 3 <br />conductor plus neutral. Pole mounted <br />transformers, 3 each, at fan site. <br />Mine Dewatering System 6 in. dia. steel pipe, 2 each x approx. <br />205 ft. long, from portal to sediment <br />pond. <br />Facility Septic System Septic tanks, 4 each 1500 gal. plastic in <br />series, single leach field design pending. <br />Ponds, I other Treatment Facilities and Diversions <br />Drainage and sediment control for Northfield's proposed surface <br />disturbances will include a sediment pond, ditches, culverts, and small <br />area sediment control structures that will minimize erosion and <br />prevent, to the extent possible, additional contributions of sediment to <br />streamflow or runoff outside the permit area. Proposed drainage and <br />sediment control structures and methods are described below and in <br />the Drainage and Sediment Control Plan (Exhibit V). The Drainage and <br />Sediment Control Plan includes supporting documentation, maps, and <br />diagrams for the proposed drainage and sediment control structures. <br />Northfield is proposing a single sediment pond located adjacent to the <br />mine facilities area. This sedimentation pond, designated Pond 1, will <br />be designed utilizing standard engineering practices to retain the <br />runoff from a 10 -year, 24 -hour storm event plus mine dewatering <br />inflow and effect compliance with all other applicable regulatory <br />standards. The proposed pond will not meet the minimum criteria for <br />designation as a MSHA structure. Pond design criteria and supporting <br />calculations are presented in Exhibit V, including information <br />concerning the size, configuration, and surface conditions affecting <br />runoff within the contributing drainage area. <br />40 Sedimentation Pond 1 is designed to retain runoff from the main mine <br />facility area. Surface water from this area will be collected and routed <br />to Pond 1 by the North and South Runoff Collection Ditches. Mine <br />2.05.3 -24 Revised 12/04/09, TR -01 <br />